Your instruction and fee scope
Send the complete communication, pending claims and cited documents. The proposal identifies objections addressed, argument or amendment work, translation, filing and subsequent reporting.
Review of the office communication
We examine the communication, cited documents, pending claims and response deadline before outlining the available response route.
How we assist
- Deadline and formalities review
- Technical and legal response coordination
- Claim amendment and translation support
- Filing and procedural follow-up
Documents required
Send the full office action, application number, current specification and claims, cited documents and any draft response or technical comments.
Response strategy depends on the cited objection
Not every examination report should be answered by narrowing the claims. We map each novelty, inventive-step or clarity objection to the cited passages, then consider argument, amendment or a combined response. Any amendment is checked against the application as filed so that solving one objection does not create an added-matter or internal-consistency problem.
Case-specific proposal
The response strategy and fee scope depend on the issues raised. We confirm both after reviewing the available documents.
Office action documents and deadline review
Send the complete communication with its notification date, Turkish case number, current claims and specification, cited prior art and all earlier submissions. Include proposed amendments in an editable version and identify the supporting passages in the application as filed.
There is no single response period covering every Turkish patent communication: a formal defect notice, examination report and appealable decision are different stages. We confirm the period and any available extension from the notice and procedure before work begins. New technical matter cannot be added merely to answer an objection.
Official reference: Industrial Property Code — Articles 95, 98, 100 and 103